Preparation for Revamping
- Step 1: Documentation and gathering information
Gearbox Identification Sectional view of the gearbox
- Step 2: Preliminary analysis
All bearing had normal wear no particular problems,..normale preventive maintenance
- Step 3: Disassembling the Gearbox
Gearbox open for visual inspection
- Step 4: Replacement and restoration of components
| Desmounting bearings | |
|
|
| Before and after correction of diameters performed on the sealing ring diameter of the fast shaft. | |
|
|
| Reassembling intermediate wheel bearing | Side cover adjustment.for axial bearing |
|
|
- Step 5: Sealing the gearbox
Sealing the gearbox
- Step 6: Final check and refill with lubricant
Refill oil lubricant after hyper filtration 2µm
-
- Step 7: Planning future monitoring
After replacing all the bearing, the customer is still check with periodically monitor the bearings after 13 years of operation, and is now considering to connect this gearbox like other machines of the department to the MRS monitoring system. We are very pruod to keep assisting after many and many year out partner with the best state of art technology.
- Step 7: Planning future monitoring
Call us Now at +39 349/3703769 or email to:info@micmrs.com